Great Lakes Carbon Treatment, Inc.
(GLCT) is a Michigan based corporation established
in January of 1990 that provides a full range
of equipment and services tailored to both environmental
and industrial concerns. Since its inception,
GLCT has built a positive reputation by providing
its clients with the finest in equipment and service.
GLCT has engineered, designed, and built some
of the most effective and technologically advanced
remediation systems available. Diversity is also
a strong point with GLCT. Our capabilities include,
but are not limited, to just treatment systems.
Our diversity has allowed GLCT to build a broad
base clientele of repeat customers throughout
the continental United States, including: facility
decontamination, groundwater filtration, industrial
wastewater treatment, bioremediation, soils remediation,
environmental contracting and construction, and
UST/AST removals and replacements,
The GLCT personnel have education and expertise
in Environmental Science, Business Management,
Construction Engineering, Design Engineering,
Civil Engineering, Petroleum Engineering, Industrial
and Environmental Management, Drafting, Civil
Engineering, Ecology, Biology, and Chemistry.
GLCT's field teams are fully trained and have
received Hazardous Material Training OSHA 1910.120,
complete with all eight (8) hour refresher courses.
GLCT has and follows a strict health and safety
manual. GLCT is fully insured, and uses only fully
insured, licensed, and permitted transporters.
All goods and services provided by GLCT are provided
in accordance with all local, state, and federal
guidelines and regulations.
Pre-built treatment package systems are a specialty
of GLCT. When systems are built in our facility,
it allows for complete quality control and results
in reduced cost for on-site setup. GLCT has completed
systems in dollar value from $750.00 to over $1,000,000.00,
comprising a vast array of technologies for both
consulting and private industries.
GLCT also exhibits strength with our on-site building
capabilities. One of our largest projects to date
being for the State of Michigan. With only 59
days to complete, and costs of over 1.2 million
dollars, GLCT performed to meet the time lines
as required by the State. We have also managed
this site for the past three years and have a
90 percent run time.
|